First Group – Essex Thamside
Overview
Part of a large rail franchise bid, OHC were commissioned to produce the hard services submission, comprising strategy, condition survey, bid writing, maintenance and life cycle costing.
Due the life cycle responsibilities under the FRI lease terms of the contract, OHC undertook a detailed survey of all the assets to inform the asset replacement programme. These assets were reviewed against their condition status and assessed life expectancy. Once this was established, a full cost modelling exercise for a 15 year period was undertaken against Network Rail’s Percentage Asset Remaining Life (PARL) methodology to calculate the potential cost impact against this rigorous standard.
Title | Address | Description |
---|---|---|
Liverpool Street | Liverpool St, London EC2M 7QH, UK | |
Stratford | London E15, UK | |
Fenchurch Street | 48 Crutched Friars, London EC3N 2AP, UK | |
Limehouse | London E14 7JE, UK | |
West Ham | Manor Rd, London E15 3BN, UK | |
Barking | Station Parade, Barking IG11 8TU, UK | |
Upminster | Station Rd, Upminster RM14 2TD, UK | |
Dagenham Dock | Dagenham RM9 6EG, UK | |
Rainham | Rainham RM13 9JA, UK | |
Purfleet | Purfleet RM19 1PP, UK | |
Ockendon | South Ockendon RM15 6PD, UK | |
Chafford Hundred | Chafford Hundred, Grays RM16 6QQ, UK | |
Grays | High St, Grays RM17 6NQ, UK | |
West Horndon | West Horndon, Brentwood CM13 3TJ, UK | |
Basildon | Basildon SS16 5XY, UK | |
Pitsea | Basildon SS16 4UH, UK | |
Tilbury Town | Tilbury RM18 7BJ, UK | |
East Tilbury | East Tilbury, Stanford-le-Hope SS17 0RQ, UK | |
Stafford-le-Hope | Stanford-le-Hope SS17 0JX, UK | |
Benfleet | South Benfleet, Benfleet SS7 1NF, UK | |
Leigh-on-Sea | Southend-on-Sea, Leigh-on-Sea SS9 2ET, UK | |
Chalkwell | Southend-on-Sea, Westcliff-on-Sea SS0 8PX, UK | |
Westcliff | Southend-on-Sea, Westcliff-on-Sea SS0 7EX, UK | |
Southend Central | Southend-on-Sea SS1 1AB, UK | |
Southend East | Southend-on-Sea SS1 2QY, UK | |
Thorpe Bay | Southend-on-Sea SS1 3QH, UK | |
Shoeburyness | Southend-on-Sea SS3 9AW, UK |
“Terrific response from Oxhey Hall. Great all-round capability and innovative approach.”
OHC’s strength and depth allowed us to undertake all these services in-house to produce a comprehensive and cohesive submission.
- Number of Assets: 3,000 100%
- Gross Internal Area: 12,000 m2 100%
- Programme: 10 Days 100%
Client
First Group
Establishments
29 Railway Stations. Essex Thameside
Service
Asset Verification and Condition Survey with Labour Loading and Life Cycle Costing. M&E and Fabric
Capture
Manual capture and desktop costings